Loader
Build: 1.2.39 - Tue, 22 Sep 2026 03:36:08 GMT
Hamburger Icon WhiteHamburger Icon
Dulux TradeDulux Trade
Login/Signup
Dulux Trade
  • About Dulux
    Dulux My Home
    Dulux Specifier
    Privacy Policy
    Terms & Conditions
    Careers
  • Customer service
    Contact Us
    Shipping & Returns
    Find a Store
    Sustainability
    Media
    Dulux Group Corporate
  • Dulux in the Community
    Surf Life Saving Club project
  • © 2026 Dulux

  • Careers
  • Recommended Sites
  • Shipping & Returns
  • Terms & Conditions
  • Privacy Policy
  • Conditions of Sale

Venetian Plaster

Quartz Primer High Build Acrylic

SALE OFF

No image preview available

SALE OFF

Venetian Plaster

Quartz Primer High Build Acrylic

Loader
Loader
Loader

About Venetian Plaster Quartz Primer High Build Acrylic

Dulux® Venetian® Plaster Quartz Primer is a primer-sealer for interior use on a plasterboard and porous masonry substrates under the Venetian® Plaster range. Apply with a conventional nap roller to fill masonry pores and minor imperfections to provide a sealed anti-slip and lightly textured surface that greatly assists the application of subsequent Venetian® Plaster feature finishes.

Downloads
Key Points
  • Easy application
  • Easy clean up
  • Available in 5L and 15L
Quick guide
close

Re-coat

16 hours

Cleaning materials

Water

Application Tools

Brush, Roller

Product specification
Surfaces
  • Masonry substrates Plasterboard
Performance guide
  • Salt: Resists migration of soluble salts
  • Alkali: Excellent Alkali Resistance
Surface preparation
Previously painted surface

Relative to Project Substrate and Specified Finish - refer to Project Specific Duspec Specification and Acratex® Substrate Guide.

How to apply
Brush, Roller

Stirring: Stir well with a broad flat paddle using an up and down scooping motion.

Cutting in: Using a brush, apply sparingly to edges, internal angles and areas not accessible with a roller. Finish brushed areas with a “dabbing” motion and feather out. Do not leave thick straight edge lines as these will be visible after roller application. Alternatively, working in a team apply broad wall areas by roller, up to edges, allowing a partner to “dab” in edges whilst still wet.

Roller application: Generously load the roller and apply from the ground upwards in vertical strips. Tip: The first few strips applied will essentially only fill the roller, with less material applied to the wall. Work these strips well to thoroughly wet out the roller. Successive strips will deliver more material to the wall Apply the material in strips of approximately ½ –1m in length. Reload roller after each strip and repeat until a manageable section has been “delivered” (approximately 3 – 4 strips wide). Spread the material evenly by rolling diagonally across the surface. Apply a fresh strip of wet material to create a “working wet edge”, then “layoff”.

Allow overnight dry to reduce the occurrence of plasterboard/ other flushing compound ghosting.

How to dispose responsibly
Unused paint
Refer to the products label and the Material Safety Data Sheet

Recently viewed products

About Dulux
Dulux My Home
Dulux Specifier
Privacy Policy
Terms & Conditions
Careers
Customer Service
Contact Us
Find a Store
Sustainability
Dulux Group Corporate