Key Points
- Achieves 50 MPa @ 28 days
- Medium weight formulation enabling extra high-build and thereby saving time and expense of multiple applications and reduces the need for formwork
- Can be overcoated with Emer-Clad Facade or other suitable coating after 24 hours*(refer to Overcoating section)
- Only the site addition of clean water required
- Contains no chloride admixtures

